home/categories/project-management
category focus

Project Mgmt

Planning, tracking, and collaboration.

3083 スキルall categories
sorting
stars
current ordering strategy
query
all entries
refine the visible subset
project-management
21

time-resource-estimator

Estimate realistic project timelines, break down hours by feature/phase, include buffer for revisions, set achievable client expectations, and avoid over-promising deadlines you can't meet.

zanecole10
zanecole10
business
open
project-management
21

skill-validator

Validates skills against production-level criteria with 9-category scoring. This skill should be used when reviewing, auditing, or improving skills to ensure quality standards. Evaluates structure, content, user interaction, documentation, domain standards, technical robustness, maintainability, zero-shot implementation, and reusability. Returns actionable validation report with scores and improvement recommendations.

panaversity
panaversity
business
open
project-management
21

project-session-management

Session state and context handoff management with SESSION.md tracking. Use for multi-session projects, resuming after context clear, phase tracking, or encountering handoff protocol, session recovery, phase progress, checkpoint errors.

secondsky
secondsky
business
open
project-management
21

research

Use when you need to research, analyze, and plan technical solutions that are scalable, secure, and maintainable.

binhmuc
binhmuc
business
open
project-management
20

research

Use when you need to research, analyze, and plan technical solutions that are scalable, secure, and maintainable.

The1Studio
The1Studio
business
open
project-management
20

spec-driven-dev

Guide Spec-Driven Development (SDD) workflow for planning changes before implementation. Use when: creating specs, proposals, planning features, using OpenSpec or similar tools. Keywords: spec, specification, SDD, proposal, openspec, design doc, 規格, 提案, 設計文件.

AsiaOstrich
AsiaOstrich
business
open
project-management
20

methodology-system

Manage and guide developers through active development methodology workflows. Use when: TDD, BDD, SDD, ATDD, or custom methodology workflows are needed. Keywords: methodology, workflow, TDD, BDD, SDD, ATDD, phase, checkpoint, development process.

AsiaOstrich
AsiaOstrich
business
open
project-management
20

spec-driven-dev

引導規格驅動開發 (SDD) 工作流程,在實作前規劃變更。 使用時機:建立規格、提案、規劃功能、使用 OpenSpec 或類似工具。 關鍵字:spec, specification, SDD, proposal, openspec, design doc, 規格, 提案, 設計文件。

AsiaOstrich
AsiaOstrich
business
open
project-management
20

event-storming

Event Storming 기법을 사용하여 PlantUML 시퀀스 다이어그램을 작성하고 유저스토리 개발을 준비합니다. 기획 구체화 시 사용하세요.

cna-bootcamp
cna-bootcamp
business
open
project-management
19

using-superpowers

Use when starting any conversation - establishes how to find and use skills, requiring Skill tool invocation before ANY response including clarifying questions

galangryandana
galangryandana
business
open
project-management
19

executing-plans

Use when you have a written implementation plan to execute in a separate session with review checkpoints

galangryandana
galangryandana
business
open
project-management
19

systematic-debugging

Use when encountering any bug, test failure, or unexpected behavior, before proposing fixes

galangryandana
galangryandana
business
open
project-management
19

standup

USE WHEN: returning to a project after time away (1 day to 30 days), needing project status briefing, understanding where work left off, determining next steps. DO NOT USE WHEN: actively working on a known task, not in a git repository, or when specific file/code questions are asked.

mahidalhan
mahidalhan
business
open
project-management
18

rail

High-speed rail / train lookup workflow (China-focused). Use for timetables, ticket availability, delays, cancellations, or “today/latest” rail updates. Prefer official sources; always include source link + local update time; NEVER fabricate.

JinFanZheng
JinFanZheng
business
open
project-management
18

project-manager

Agile/Scrum süreçleri, backlog yönetimi ve paydaş iletişimi.

vuralserhat86
vuralserhat86
business
open
project-management
18

business-analysis

Use for deep requirements analysis, technical specifications, agile documentation, or architecture/design reviews.

kienhaminh
kienhaminh
business
open
project-management
18

chain-link

Save a work checkpoint to preserve context for multi-session projects. Use when pausing work on a feature, completing a milestone, or before ending a session.

advpropsys
advpropsys
business
open
project-management
18

plan-work

Koddan önce planlama, repo araştırması, risk analizi ve implementation plan oluşturma rehberi.

vuralserhat86
vuralserhat86
business
open
project-management
18

project-management

This skill should be used when creating or updating PROJECT.md files, planning sprints, defining project goals, or managing project scope. It provides templates and best practices for PROJECT.md-first development.

vuralserhat86
vuralserhat86
business
open
project-management
18

itinerary

行程安排/行程规划(国内为主)。当用户要你“做行程/排几天怎么玩/把交通酒店景点串起来/做出差安排/把计划写进日历”时使用。 产出可执行的日程(含时间块),并在引用外部事实时附来源链接与来源当地时间;绝不编造。

JinFanZheng
JinFanZheng
business
open
project-management
18

sparc-methodology

SPARC (Specification, Pseudocode, Architecture, Refinement, Completion) comprehensive development methodology with multi-agent orchestration

vuralserhat86
vuralserhat86
business
open
project-management
18

commute

通勤方案/路线规划(点到点或多点串联)。用于用户问“怎么去/怎么走/通勤方案/地铁公交换乘/打车多久多少钱/从酒店去景点或会场”等。 默认做实时查证并给来源链接与查询时间(当地时间);不编造精确数字;写入日历必须用户明确确认。

JinFanZheng
JinFanZheng
business
open
project-management
18

roadmap-planner

Implementation roadmap, timeline oluşturma, risk yönetimi ve kaynak planlaması rehberi.

vuralserhat86
vuralserhat86
business
open
project-management
18

meeting-summary

生成结构化的会议纪要,包含议题摘要、决策事项和行动项

twwch
twwch
business
open
Previous
Page 48 / 129
Next