home/categories/project-management
category focus

Project Mgmt

Planning, tracking, and collaboration.

3083 ์Šคํ‚ฌall categories
sorting
์Šคํƒ€
current ordering strategy
query
all entries
refine the visible subset
project-management
0

vertical-slice-roadmap-planner

Read a vertical slice GDD and generate a phased roadmap of features that need to be implemented, organized into logical phases with high-level feature descriptions.

cautiouskurns
cautiouskurns
business
open
project-management
0

project-planner

้กน็›ฎ่ทฏๅพ„่ง„ๅˆ’ไธŽๆ‰ง่กŒๅŠฉๆ‰‹ใ€‚ๅธฎๅŠฉๅˆ†ๆž้กน็›ฎ้œ€ๆฑ‚ใ€่ง„ๅˆ’ๆ‰ง่กŒ่ทฏๅพ„ใ€ๅˆ†่งฃไปปๅŠกใ€่ฏ†ๅˆซ้ฃŽ้™ฉใ€็ฎก็†่ฟ›ๅบฆ๏ผŒ็กฎไฟ้กน็›ฎ้ซ˜่ดจ้‡ไบคไป˜ใ€‚

aAAaqwq
aAAaqwq
business
open
project-management
0

project-context

Project state management using CONTEXT.md files with Past/Current/Future sections. Use when: "project context", "CONTEXT.md", "project status", "where are we", "project state".

joint-hubs
joint-hubs
business
open
project-management
0

planning-features

Plan and document features before implementation using project templates. Use when planning new features, creating architecture docs, or when user mentions "plan", "design", "architect", "feature plan", "implementation plan", or "before coding".

sorfeb
sorfeb
business
open
project-management
0

aico-backend-plan

Create ATOMIC implementation plan for a single backend task. Each step has TDD, exact code, and verification command. IMPORTANT: This skill creates MICRO-LEVEL atomic steps, NOT macro architecture plans. For architecture planning or feature scoping, use EnterPlanMode instead. Use this skill when: - Running /backend.plan command - User explicitly asks for "atomic steps", "step-by-step plan with verification" - Have a specific task from docs/reference/backend/tasks/ and need implementation steps - Need granular TDD steps: Types โ†’ DB โ†’ Test (failing) โ†’ Implementation โ†’ Test (passing) โ†’ API DO NOT use for: - Architecture planning (use EnterPlanMode) - General development planning - Feature scoping or estimation Output: Present plan to user (not saved to file), each step includes Files, Action, and Verify command.

yellinzero
yellinzero
business
open
project-management
0

achievement-quantifier

Strengthens CV bullet points by adding specific metrics, percentages, timescales, and quantifiable results.

petehannam
petehannam
business
open
project-management
0

handoff-summary

Generate structured handoff for session transitions or task boundaries. Use before clearing session, after completing a task group, or when context degradation is suspected.

arielZusman
arielZusman
business
open
project-management
0

suggest-skill

็พๅœจใฎ็Šถๆณใ‚„ใ‚ฟใ‚นใ‚ฏใซๅˆใ‚ใ›ใฆใ€ไปŠไฝฟใ†ในใใŠใ‚นใ‚นใƒกใฎใ‚นใ‚ญใƒซใ‚’ๆๆกˆใ™ใ‚‹

tatsuki-washimi
tatsuki-washimi
business
open
project-management
0

active-reconnaissance

Skill for identifying the gap between a user's request and the project's current reality (code, existing ADRs, and documentation). Used for (1) uncovering discrepancies between intent and implementation, (2) gathering factual evidence from the codebase and SSOT, and (3) establishing a grounded starting point for new architectural decisions.

masa-codehub
masa-codehub
business
open
project-management
0

implement-ticket

Implement a Beads ticket with documentation grounding and correction workflow

majtom2grndctrl
majtom2grndctrl
business
open
project-management
0

presentation

Generate a Marp presentation from an intent's spec. Use when the user wants to create slides for an intent or asks to make a presentation.

sejas
sejas
business
open
project-management
0

executing-plans

่จˆ็”ปๅฎŸ่กŒใ‚นใ‚ญใƒซใ€‚ไบ‹ๅ‰ไฝœๆˆใ•ใ‚ŒใŸ่จˆ็”ปใ‚’ๅˆฅใ‚ปใƒƒใ‚ทใƒงใƒณใงๅฎŸ่ฃ…ใ™ใ‚‹ๆง‹้€ ๅŒ–ใ‚ขใƒ—ใƒญใƒผใƒใ€‚

HaRu-LLC
HaRu-LLC
business
open
project-management
0

plan-writer

ๅฎŸ่ฃ…่จˆ็”ปใ‚’ไฝœๆˆใ™ใ‚‹้š›ใซtmp/้…ไธ‹ใซใƒ•ใ‚กใ‚คใƒซใ‚’้…็ฝฎใ™ใ‚‹ใ‚ˆใ†ใ‚ฌใ‚คใƒ‰ใ—ใพใ™ใ€‚docs/ใธใฎไธ่ฆใชใƒ‰ใ‚ญใƒฅใƒกใƒณใƒˆ็”Ÿๆˆใ‚’้˜ฒใŽใ€ไธ€ๆ™‚็š„ใช่จˆ็”ปใƒ•ใ‚กใ‚คใƒซใ‚’้ฉๅˆ‡ใซ็ฎก็†ใ—ใพใ™ใ€‚

sage-base
sage-base
business
open
project-management
0

analysis-planning

Structure analysis approach before starting work. Use when receiving new analysis requests, breaking down complex questions into steps, or planning iterative analysis workflows.

nimrodfisher
nimrodfisher
business
open
project-management
0

work-item-planning

1ไฝœๆฅญ=1ใƒ‡ใ‚ฃใƒฌใ‚ฏใƒˆใƒช๏ผˆdocs/<work_item>/๏ผ‰ใงใ€implementedplan.md ใจ tasks.md ใ‚’ไฝœใ‚‹ๆ‰‹้ †ใจใƒ†ใƒณใƒ—ใƒฌใ€‚

okurawave
okurawave
business
open
project-management
0

task-breakdown

Divide pedidos grandes em micro-tarefas pequenas e sequenciais antes de escrever qualquer cรณdigo.

bernardohaha
bernardohaha
business
open
project-management
0

linear-issue

Creates structured Linear issues following team conventions. Use when the user asks to create a ticket, issue, or task in Linear, or mentions tracking work, bugs, features, improvements, chores, or spikes.

dairectiv
dairectiv
business
open
project-management
0

obsidian-session-close

Cierra una sesion dejando resumen, pendientes y mejoras con trazabilidad.

AlejandroIglesiasCalvo
AlejandroIglesiasCalvo
business
open
project-management
0

gestion-alcance-scope

Skill especializada en gestiรณn de alcance (scope) para Domain Storytelling, enfocada en ajustar la granularidad del modelado (coarse-grained "pรกjaro/cometa" vs fine-grained "mar/peces") y distinguir perspectivas temporales (As-Is proceso actual vs To-Be futuro deseado). รštil para definir el nivel apropiado de detalle segรบn el objetivo del modelado y para gestionar expectativas entre stakeholders.

imaginabit
imaginabit
business
open
project-management
0

implement-feature

่จญ่จˆๆธˆใฟๆฉŸ่ƒฝใฎTDDๅฎŸ่ฃ…ใƒฏใƒผใ‚ฏใƒ•ใƒญใƒผ

kohei240155
kohei240155
business
open
project-management
0

spec-test-generator

Converts PRDs/user stories into stable-ID requirements (REQ-xxxx), a structured test plan, a test case catalog (TEST-xxxx), and a traceability matrix. Supports iterative updates without renumbering IDs. Ships with pragmatic internal default and strict preset.

akz4ol
akz4ol
business
open
project-management
0

wiz-dev

wizใƒ—ใƒญใ‚ธใ‚งใ‚ฏใƒˆ้–‹็™บๆ”ฏๆดใ‚นใ‚ญใƒซใ€‚specs/ใƒ‡ใ‚ฃใƒฌใ‚ฏใƒˆใƒชใฎไป•ๆง˜ๆ›ธใ‚’ๅ‚็…งใ—ใ€TODOใ‚ฟใ‚นใ‚ฏใ‚’ๅฎŸ่ฃ…ใ™ใ‚‹ใ€‚ ไฝฟ็”จใ‚ฟใ‚คใƒŸใƒณใ‚ฐ: (1) wizใƒ—ใƒญใ‚ธใ‚งใ‚ฏใƒˆใฎ้–‹็™บไฝœๆฅญใ€(2) specs/ใฎTODOใ‚’้€ฒใ‚ใŸใ„ๆ™‚ใ€ (3) ใ€Œๆฌกใฎใ‚ฟใ‚นใ‚ฏใ€ใ€ŒTODOใ€ใ€ŒๅฎŸ่ฃ…ใ—ใฆใ€ใชใฉใฎ้–‹็™บใƒชใ‚ฏใ‚จใ‚นใƒˆๆ™‚ใ€‚ ไฝœๆฅญๅฎŒไบ†ๅพŒใฏdocs/ใ‚’ๆ›ดๆ–ฐใ™ใ‚‹ใ€‚

NOPLAB
NOPLAB
business
open
project-management
0

faion-product-manager

Product Manager role: MVP/MLP planning, feature prioritization (RICE, MoSCoW), roadmaps, backlog management, user story mapping, OKRs, lean canvas, jobs-to-be-done, value proposition, 9 product frameworks (MVP/MLP/MMP/MAC/RAT), Micro-MVPs, Continuous Discovery. 23 methodologies.

faionfaion
faionfaion
business
open
project-management
0

moai-workflow-project

Integrated project management system with documentation, language initialization, and template optimization modules

rdmptv
rdmptv
business
open
Previous
Page 102 / 129
Next