home/categories/project-management
category focus

Project Mgmt

Planning, tracking, and collaboration.

3083 skillsall categories
sorting
stars
current ordering strategy
query
all entries
refine the visible subset
project-management
2

teamwork-clean

This skill should be used when agents need to reset a teamwork project's execution state while preserving metadata. Use before starting a new project in the same session, after a failed project, or when task/verification state is corrupted. Cleans tasks/, verification/, workers/ directories while keeping project.json intact.

mnthe
mnthe
business
open
project-management
2

implementation-phase

Standard Operating Procedure for /implement phase. TDD workflow, anti-duplication checks, task execution, and continuous testing.

marcusgoll
marcusgoll
business
open
project-managementmarketplace
2

reporting

Generate comprehensive multi-tenant security and operational reports from LimaCharlie. Provides billing summaries, usage roll-ups, detection trends, sensor health monitoring, and configuration audits across multiple organizations. Supports both per-tenant detailed breakdowns and cross-tenant aggregated roll-ups. Built with strict data accuracy guardrails to prevent fabricated metrics. Supports partial report generation when some organizations fail, with transparent error documentation. Time windows always displayed, detection limits clearly flagged, zero cost calculations.

refractionPOINT
refractionPOINT
business
open
project-management
2

brainstorming

Collaborative design methodology for creative work. Use before research or planning when requirements are unclear, multiple approaches exist, or the idea needs exploration. Refines ideas through progressive questioning.

bostonaholic
bostonaholic
business
open
project-management
2

session-resume

Use at start of new session to restore context from STATUS.json - loads previous state, displays session type, shows what to continue working on. Calculates session type (Continuation/Resume/Fresh Start) based on time gap. Do NOT use mid-session or when starting fresh work unrelated to previous session - just begin the new task directly.

jrc1883
jrc1883
business
open
project-management
2

evaluation-criteria

Defines evaluation criteria and scoring methodologies for deliverable assessment

masanao-ohba
masanao-ohba
business
open
project-management
2

epic-management

Use for LARGE work requiring feature-level grouping. Creates epic tracking issues, manages related issues under a common label, tracks epic progress, and coordinates with milestones.

troykelly
troykelly
business
open
project-management
2

workshop-facilitator

Design and facilitate effective workshops with agendas, activities, and outcomes

eddiebe147
eddiebe147
business
open
project-management
2

quality-assurance

品質保証・QAガイド。テスト計画、品質メトリクス、バグ管理、リリース判定基準、探索的テスト、ユーザビリティテストなど、ソフトウェア品質を確保するための実践的な手法。

Gaku52
Gaku52
business
open
project-management
2

executing-plans

Use when you have a written implementation plan to execute in a separate session with review checkpoints

mikeastock
mikeastock
business
open
project-management
2

project-status

Assess project activity, surface priorities, and maintain persistent backlog

ZenterFlow
ZenterFlow
business
open
project-management
2

requirement-review

Conducts comprehensive requirements review including completeness validation, clarity assessment, consistency checking, testability evaluation, and standards compliance. Produces detailed review reports with findings, gaps, conflicts, and improvement recommendations. Use when reviewing requirements documents (BRD, SRS, user stories), validating acceptance criteria, assessing requirements quality, identifying gaps and conflicts, or ensuring standards compliance (IEEE 830, INVEST criteria). Trigger when users mention "review requirements", "validate requirements", "check requirements quality", "find requirement issues", or "assess BRD/SRS quality".

DauQuangThanh
DauQuangThanh
business
open
project-management
2

focus-timer

Structured focus sessions using Pomodoro and deep work timing techniques

eddiebe147
eddiebe147
business
open
project-management
2

tool-evaluator

You are a pragmatic and analytical Tool Evaluator. You have a broad knowledge of the software development landscape and a talent for systematically evaluating and comparing tools to find the best fit for a specific job. You are objective, thorough, and focused on making data-driven recommendations.

aibangjuxin
aibangjuxin
business
open
project-management
2

schedule-optimization

Multi-objective schedule optimization expertise using constraint programming and Pareto optimization. Use when generating schedules, improving coverage, balancing workloads, or resolving conflicts. Integrates with OR-Tools solver and resilience framework.

Euda1mon1a
Euda1mon1a
business
open
project-management
2

project-board-enforcement

MANDATORY for all work - the project board is THE source of truth. This skill provides verification functions and gates that other skills MUST call. No work proceeds without project board compliance.

troykelly
troykelly
business
open
project-management
2

summarizing-epic-issue

Summarizes GitHub Epic issue with sub-issues and PR status. Use when: user wants epic summary, project overview, or implementation status.

sasamuku
sasamuku
business
open
project-management
2

railway

Railway commands applicable and useful for this project

eighttrigrams
eighttrigrams
business
open
project-management
2

solver-control

Solver kill-switch and progress monitoring for schedule generation. Use when aborting runaway solvers, monitoring long-running schedule generation, or integrating abort checks into solver loops.

Euda1mon1a
Euda1mon1a
business
open
project-management
2

production-incident-responder

Crisis response skill for production system failures. Integrates with MCP resilience tools to detect, diagnose, and respond to critical system failures. Use when production system shows signs of failure or during emergency situations.

Euda1mon1a
Euda1mon1a
business
open
project-management
2

task-loop

Iterative execution methodology. Small steps, verify each, adapt based on results.

duyet
duyet
business
open
project-management
2

brainstorming

Proactively use when brainstorming potential solutions to difficult problems.

hdemers
hdemers
business
open
project-management
2

planning

Proactively use when making a plan, e.g. the user says "Let's make a plan".

hdemers
hdemers
business
open
Previous
Page 71 / 129
Next